With Teenconsulting, save without investing !


Energy Performance Contract


The objective of the EPC is to reduce your energy consumption directly, with no additional investment, thourgh concrete actions carried out in the field.




In short,


EPC




In detail

Teenconsulting’s engineers are experts in the field and are aware of the complex workings of HVAC equipment control. We can reduce your energy consumption to a significant extent, DIRECTLY and WITH NO ADDITIONAL EQUIPMENT INVESTMENT, through concrete actions on site.

The resulting percentage saving obviously depends on the way the existing facilities operate and the potential of possible actions. However, our experience show us that this percentage saving amounts to at least 15% of the energy consumtion preceding our actions.




Success stories


Schaerbeek.

.EPC for 18 buildings for the Schaerbeek Municipal Authorities (Schools and administrative complexes) :

17,00% or an energy saving of € 62.000 per year in 2014-2015

.

.

.klkGHdC

EPC for the technical facilities of the Grand Hôpital de Charleroi (regional hospital) :

⇒ 14,60% or an energy saving of € 60.000 between 2009 and 2010
No contrat in 2010-2011 ⇒ Increase in consumption by 4,4%
12,00% or € 45.000 of energy savings between 2011 and 2012

.

.

.lkg

TotalEPC for the technical facilities of TOTAL’s Research Centre in Feluy:
⇒ 14,00% or € 68.000 of energy savings between 2009 and 2010
.⇒ No contrat in 2010-2011 ⇒ Increase in energy consumption by 10.5%
.7,00% or € 35.000 of energy savings between 2011 and 2012

.




Consult our references !

Back to Top